Open Framework, Information Management Strategy & Collaborative Governance | Data & Social Methodology - MIKE2.0 Methodology
Wiki Home
Collapse Expand Close

Members
Collapse Expand Close

To join, please contact us.

Improve MIKE 2.0
Collapse Expand Close
Need somewhere to start? How about the most wanted pages; or the pages we know need more work; or even the stub that somebody else has started, but hasn't been able to finish. Or create a ticket for any issues you have found.

Initial Report Design Deliverable Template

From MIKE2.0 Methodology

Share/Save/Bookmark
Jump to: navigation, search
Under review.png
This article is a stub. It is currently undergoing major changes as it is in the very early stages of development and is only a placeholder. Please help improve MIKE2.0 by adding to this article.
This deliverable template is used to describe a sample of the MIKE2.0 Methodology (typically at a task level). More templates are now being added to MIKE2.0 as this has been a frequently requested aspect of the methodology. Contributors are strongly encouraged to assist in this effort.
Deliverable templates are illustrative as opposed to fully representative. Please help add examples to this template that are representative of the proposed output.

The Initial Report Design task establishes standards for developers to follow when creating any BI Applications. Any early prototype shown to the users should be revisited with them. Before the design process for this interface begins, it is important to determine whether there are any standards established for creating interfaces. If so, this application should conform to the existing standards. If no such standards exist, then it is important to take the time to get agreement on this area. Some of these initial standards were developed during Phase 2 at a high level.

Mock-up report screens (without real data) may be created to help users capture the look-and-feel of reports.

Example for a sample BI Initial Report Design

Listed below are example report design samples:

REPORT GROUP ABC Sustainability REPORT NAME Sustainability Report REPORT ID  
DESCRIPTION The Sustainability Report provides an assessment of sustainability in terms of inventory allowance versus stock-on-hand and any associated shortfall.
STRUCTURE Each set of data for a Sustainability report is calculated relative to a user-defined scenario. A scenario consists of defining a task group in terms of which XYZ

’ s are included, a range of scenario parameters and options, and a scenario date and title used for identification.

GRANULARITY The Sustainability Report provides detail down to individual NSN level.
SUMMARY DIMENSIONS (These are hierarchical structures used to select a given summary view of the measures in the report. Italics indicate non-default levels in default dimensions.)
INVENTORY (default) TASK GROUP (optional) FORCE ELEMENT (optional) SYSTEM (optional)  
Stock items are grouped by inventory type and subtype, and the systems that they are fitted or belong to. Task Group represents the combination of Force Elements required to complete a naval operational scenario. Force elements (e.g. single ships) are grouped by force element type (ship class) and force element group. Inventory stock items are grouped by the systems that they are fitted or belong to.  
LEVELS LEVELS LEVELS LEVELS (overlaps INVENTORY)  
Inventory Type Task Group Type Force Element Group System Management Function (MF)  
Inventory Subtype Task Group Description Force Element Type System Management Group (SMG)  
System Management Function (MF)   Force Element Stock Code (NSN)  
System Management Group (SMG)        
Stock Code (NSN)        
FILTER DIMENSIONS (These constrain the report content at the current summary point to a subset of the population and/or categorise the data into groups for presentation and filtering purposes.)
NAME DESCRIPTION APPLICATION
SCENARIO DATE Scenario Date is the date on which the reporting data was produced. Report content is constrained to data with the selected Scenario Date.
LEAD TIME The Lead Time dimension groups stock items based on Inventory Lead Time into one of the following categories -

> 30 Days, > 90 Days, > 180 Days, > 365 Days.

Report content is constrained to stock items within the selected Lead Time category.
(The categories correlate to Readiness NTM periods and the report therefore shows items that CANNOT be procured within the NTM time frame.)
READINESS (NTM) Readiness (NTM), or Notice to Move, represents the notice period available to a force element to deploy and therefore the lead time available for procurement prior to departure. It groups stock items based on Inventory Lead Time into one of the following readiness periods -

< =30 Days, < =90 Days, < =180 Days, < =365 Days.

Report content is constrained to stock items with an Inventory Lead Time that does not exceed the selected Readiness (NTM) period.
(The report therefore shows items that CAN be procured within the NTM time frame.)
SUSTAINMENT PERIOD The sustainment period dimension groups data by sustainment period. Report content is constrained to data with the selected Sustainment Period.
INVENTORY LEAD TIME Inventory Lead Time is the time required for a stock item to be received from the time it is ordered. If missing, consumables default to 90 days, repairable to 180 days. The Scenario Date is used to determine the applicable Inventory Lead Time for each stock item. Report content is constrained to stock items with the selected Inventory Lead Time.
STOCK ITEM OWNER CODE Stock Item owner is responsible for stock levels and procurement of a stock item. Missing stock item owner code is assigned a default of "UNKNOWN". Report content is constrained to stock items with the selected Stock Item Owner Code.
NSN

’ s IN SHORTAGE

This is the subset of stock items that have a non-zero shortage quantity. Report content is constrained to stock items with a non-zero shortage quantity.
STOCK ITEM CODE & DESC This is a concatenation of stock code and stock description used to identify an NSN. Drag on to report to replace the current view with one where each line represents an NSN.
SYSTEM INVENTORY TYPE VIEW View of system inventory types without double-counting of multi-mapped NSNs. Shows correct content without INVENTORY dimension. (See report training material.)
ALL INVENTORY TYPE VIEW View of all inventory types without double-counting of multi-mapped NSNs. Shows correct content without INVENTORY dimension. (See report training material.)
SOH COUNT NSN This provides a count of distinct NSN

’ s with "Stock on Hand Qty" greater than zero.

This calculates the "Stock on Hand Count" measure and has no effect on the report.
ALLOWANCE COUNT NSN This provides a count of distinct NSN

’ s with "Allowance Qty" greater than zero.

This calculates the "Allowance Count" measure and has no effect on the report.
MEASURES (These are data items that can be summarised and form the main body of the report. Default measures are in normal text. Non-default measures are in italics.)
Allowance Cost Shortage Cost % Shortage Cost Stock on Hand Cost Actual Stock on Hand Qty Unit Cost Amt  
Allowance Count Shortage Count % Shortage Count Stock on Hand Count Dues In Qty Inventory Lead Time  
Allowance Qty Shortage Qty % Shortage Qty Stock on Hand Qty Dues Out Qty    
FACTS (These are additional data items at the lowest level of granularity available via drill-through.)
None              

REPORT GROUP ABC Sustainability REPORT NAME Sustainability Report (System Shortfall) REPORT ID  
DESCRIPTION The Sustainability Report (System Shortfall) provides inventory allowance and shortfall for fitted and non-fitted parts according to System Management Group.
STRUCTURE Each set of data for a Sustainability Report (System Shortfall) is calculated relative to a user-defined scenario. A scenario consists of defining a task group in terms of which XYZ

’ s are included, a range of scenario parameters and options, and a scenario date and title used for identification.

GRANULARITY The Sustainability Report (System Shortfall) provides detail down to individual NSN level.
SUMMARY DIMENSIONS (These are hierarchical structures used to select a given summary view of the measures in the report. Italics indicate non-default levels in default dimensions.)
SYSTEM (default) TASK GROUP (optional) FORCE ELEMENT (optional) FORCE ELEMENT SYSTEM (optional)  
Inventory stock items are grouped by the systems that they are fitted or belong to. Task Group represents the combination of Force Elements required to complete a naval operational scenario. Force elements (e.g. single ships) are grouped by force element type (ship class) and force element group. Provides a view of systems by force element.  
LEVELS LEVELS LEVELS LEVELS (overlaps SYSTEM)  
System Management Function (MF) Task Group Type Force Element Group Force Element  
System Management Group (SMG) Task Group Description Force Element Type System Management Function (MF)  
Stock Code (NSN)   Force Element System Management Group (SMG)  
      Stock Code (NSN)  
         
FILTER DIMENSIONS (These constrain the report content at the current summary point to a subset of the population and/or categorise the data into groups for presentation and filtering purposes.)
NAME DESCRIPTION APPLICATION
SCENARIO DATE Scenario Date is the date on which the reporting data was produced. Report content is constrained to data with the selected Scenario Date.
LEAD TIME The Lead Time dimension groups stock items based on Inventory Lead Time into one of the following categories -

> 30 Days, > 90 Days, > 180 Days, > 365 Days.

Report content is constrained to stock items within the selected Lead Time category.
(The categories correlate to Readiness NTM periods and the report therefore shows items that CANNOT be procured within the NTM time frame.)
READINESS (NTM) Readiness (NTM), or Notice to Move, represents the notice period available to a force element to deploy and therefore the lead time available for procurement prior to departure. It groups stock items based on Inventory Lead Time into one of the following readiness periods -

< =30 Days, < =90 Days, < =180 Days, < =365 Days.

Report content is constrained to stock items with an Inventory Lead Time that does not exceed the selected Readiness (NTM) period.
(The report therefore shows items that CAN be procured within the NTM time frame.)
SUSTAINMENT PERIOD The sustainment period dimension groups data by sustainment period. Report content is constrained to data with the selected Sustainment Period.
INVENTORY LEAD TIME Inventory Lead Time is the time required for a stock item to be received from the time it is ordered. If missing, consumables default to 90 days, repairable to 180 days. The Scenario Date is used to determine the applicable Inventory Lead Time for each stock item. Report content is constrained to stock items with the selected Inventory Lead Time.
STOCK ITEM OWNER CODE Stock Item owner is responsible for stock levels and procurement of a stock item. Missing stock item owner code is assigned a default of "UNKNOWN". Report content is constrained to stock items with the selected Stock Item Owner Code.
NSN

’ s IN SHORTAGE

This is the subset of stock items that have a non-zero shortage quantity. Report content is constrained to stock items with a non-zero shortage quantity.
STOCK ITEM CODE & DESC This is a concatenation of stock code and stock description used to identify an NSN. This dimension can be dragged on to the report to replace the current view with one where each line represents an NSN.
SOH COUNT NSN This provides a count of distinct NSN

’ s with "Stock on Hand Qty" greater than zero.

This calculates the "Stock on Hand Count" measure and has no effect on the report.
ALLOWANCE COUNT NSN This provides a count of distinct NSN

’ s with "Allowance Qty" greater than zero.

This calculates the "Allowance Count" measure and has no effect on the report.
MEASURES (These are data items that can be summarised and form the main body of the report. Default measures are in normal text. Non-default measures are in italics.)
Allowance Cost Shortage Cost % Shortage Cost Stock on Hand Cost Actual Stock on Hand Qty Unit Cost Amt  
Allowance Count Shortage Count % Shortage Count Stock on Hand Count Dues In Qty Inventory Lead Time  
Allowance Qty Shortage Qty % Shortage Qty Stock on Hand Qty Dues Out Qty    
FACTS (These are additional data items at the lowest level of granularity available via drill-through.)
None              

REPORT GROUP ABC Sustainability REPORT NAME Inventory Lead Time List REPORT ID  
DESCRIPTION The Inventory Led Time List provides users with a list of stock items that have an inventory shortfall (relative to allowance) along with associated lead times.
STRUCTURE Each set of data for an Inventory Lead Time List is calculated relative to a user-defined scenario. A scenario consists of defining a task group in terms of which XYZ

’ s are included, a range of scenario parameters and options, and a scenario date and title used for identification.

GRANULARITY The Inventory Lead Time List provides detail down to individual NSN level.
SUMMARY DIMENSIONS (These are hierarchical structures used to select a given summary view of the measures in the report. Italics indicate non-default levels in default dimensions.)
SYSTEM (optional) TASK GROUP (optional) FORCE ELEMENT (optional) FORCE ELEMENT SYSTEM (optional)  
Inventory stock items are grouped by the systems that they are fitted or belong to. Task Group represents the combination of Force Elements required to complete a naval operational scenario. Force elements (e.g. single ships) are grouped by force element type (ship class) and force element group. Provides a view of systems by force element.  
LEVELS LEVELS LEVELS LEVELS (overlaps SYSTEM)  
System Management Function (MF) Task Group Type Force Element Group Force Element  
System Management Group (SMG) Task Group Description Force Element Type System Management Function (MF)  
Stock Code (NSN)   Force Element System Management Group (SMG)  
      Stock Code (NSN)  
         
FILTER DIMENSIONS (These constrain the report content at the current summary point to a subset of the population and/or categorise the data into groups for presentation and filtering purposes.)
NAME DESCRIPTION APPLICATION
SCENARIO DATE Scenario Date is the date on which the reporting data was produced. Report content is constrained to data with the selected Scenario Date.
LEAD TIME The Lead Time dimension groups stock items based on Inventory Lead Time into one of the following categories -

> 30 Days, > 90 Days, > 180 Days, > 365 Days.

Report content is constrained to stock items within the selected Lead Time category.
(The categories correlate to Readiness NTM periods and the report therefore shows items that CANNOT be procured within the NTM time frame.)
READINESS (NTM) Readiness (NTM), or Notice to Move, represents the notice period available to a force element to deploy and therefore the lead time available for procurement prior to departure. It groups stock items based on Inventory Lead Time into one of the following readiness periods -

< =30 Days, < =90 Days, < =180 Days, < =365 Days.

Report content is constrained to stock items with an Inventory Lead Time that does not exceed the selected Readiness (NTM) period.
(The report therefore shows items that CAN be procured within the NTM time frame.)
SUSTAINMENT PERIOD The sustainment period dimension groups data by sustainment period. Report content is constrained to data with the selected Sustainment Period.
INVENTORY LEAD TIME Inventory Lead Time is the time required for a stock item to be received from the time it is ordered. If missing, consumables default to 90 days, repairable to 180 days. The Scenario Date is used to determine the applicable Inventory Lead Time for each stock item. Report content is constrained to stock items with the selected Inventory Lead Time.
STOCK ITEM OWNER CODE (Applied as default dimension) Stock Item owner is responsible for stock levels and procurement of a stock item. Missing stock item owner code is assigned a default of "UNKNOWN". Report content is constrained to stock items with the selected Stock Item Owner Code.
NSN

’ s IN SHORTAGE

This is the subset of stock items that have a non-zero shortage quantity. Report content is constrained to stock items with a non-zero shortage quantity.
STOCK ITEM CODE & DESC (Applied as default dimension) This is a concatenation of stock code and stock description used to identify an NSN. This dimension can be dragged on to the report to replace the current view with one where each line represents an NSN.
SOH COUNT NSN This provides a count of distinct NSN

’ s with "Stock on Hand Qty" greater than zero.

This calculates the "Stock on Hand Count" measure and has no effect on the report.
ALLOWANCE COUNT NSN This provides a count of distinct NSN

’ s with "Allowance Qty" greater than zero.

This calculates the "Allowance Count" measure and has no effect on the report.
MEASURES (These are data items that can be summarised and form the main body of the report. Default measures are in normal text. Non-default measures are in italics.)
Allowance Cost Shortage Cost % Shortage Cost Stock on Hand Cost Actual Stock on Hand Qty Unit Cost Amt  
Allowance Count Shortage Count % Shortage Count Stock on Hand Count Dues In Qty Inventory Lead Time  
Allowance Qty Shortage Qty % Shortage Qty Stock on Hand Qty Dues Out Qty    
FACTS (These are additional data items at the lowest level of granularity available via drill-through.)
None              