The indicators below define the typical level of applicability of MIKE2.0 Activities for different types of projects. This model is a high-level starting point to provide a guide as opposed an exact mapping of required activities. If in doubt, it is better to assume that the Activity is in scope as a starting point. It can always be skipped later in the project.